Zavedení
This manual provides essential information for the safe and efficient operation, installation, and maintenance of the GoodWe 3648-EM Hybrid Inverter. Please read this manual thoroughly before installation and operation, and keep it for future reference.
The GoodWe 3648-EM is a high-performance hybrid inverter designed for residential and light commercial solar energy systems, integrating solar power generation, battery storage, and grid connection capabilities.
Konec produktuview
The GoodWe 3648-EM Hybrid Inverter system includes the main inverter unit and a three-phase Smart Meter for comprehensive energy management.

Figure 1: GoodWe 3648-EM Hybrid Inverter (top) and accompanying Smart Meter (bottom left).
This image displays the primary components of the GoodWe 3648-EM system. The larger unit is the hybrid inverter, characterized by its white casing and black control panel with indicator lights. Below and to the left is the compact Smart Meter, designed for DIN rail mounting, also in a white casing with a small display and indicator lights.

Obrázek 2: Přední strana view of the GoodWe 3648-EM Hybrid Inverter.
This image shows a detailed front view of the GoodWe 3648-EM Hybrid Inverter. The front panel features a series of LED indicators and buttons for status monitoring and basic control. The GoodWe logo is visible on the right side of the control panel.

Obrázek 3: Detail view of the GoodWe Smart Meter.
This image provides a close-up of the GoodWe Smart Meter, a compact device with a small digital display and several indicator lights (power, communication, status). It is designed for integration into electrical panels to monitor energy flow.
Technické specifikace
| Funkce | Specifikace |
|---|---|
| Model | GW3648-EM |
| Jmenovitý výkon | 3.68 kVA |
| Backup Power (Single-phase) | 5.0 kW |
| MPP Trackers | 2 |
| MPPT svtage Dosah | 280-500 V DC |
| Max. Nabíjecí proud | 50 A DC |
| Sdělení | Wi-Fi, Integrated Web Server |
| Chytrý měřič | Three-phase included |
| Rozměry (Š x V x H) | 347 x 432 x 175 mm |
| Třída ochrany | IP65 |
| Hmotnost | 17 kg |
Bezpečnostní pokyny
Always adhere to local electrical codes and regulations. Installation and maintenance should only be performed by qualified personnel.
- Ensure the inverter is disconnected from all power sources (PV, battery, grid) before performing any work.
- Neotevírejte měnič casing unless explicitly instructed by GoodWe technical support.
- Nedotýkejte se elektrických součástí pod napětím.
- Zajistěte správné uzemnění střídače.
- Udržujte děti a neoprávněné osoby mimo oblast instalace.
Instalace a nastavení
1. Vybalení a kontrola
Carefully unpack the inverter and Smart Meter. Inspect all components for any signs of damage during transit. Report any damage to your supplier immediately.
2. Mounting the Inverter
Choose a suitable mounting location that is:
- Well-ventilated and protected from direct sunlight.
- Mimo dosah hořlavých materiálů.
- Přístupné pro údržbu.
- Capable of supporting the inverter's weight (17 kg).
Use the provided mounting bracket and hardware to securely fasten the inverter to a solid wall or frame.
3. Elektrické připojení
All electrical connections must comply with local wiring regulations and standards. Refer to the connection diagram below for guidance.

Obrázek 4: Zadní view of the GoodWe 3648-EM Hybrid Inverter showing connection ports.
This image displays the rear panel of the GoodWe 3648-EM Hybrid Inverter, highlighting its various connection terminals. These include inputs for PV strings (PV1, PV2), battery connections, grid connection (ON-GRID), backup load connection (BACK-UP), and communication ports (RS485, Meter). A large heat sink is visible at the bottom.
- Připojení FV: Connect the positive and negative cables from your solar array to the PV1 and PV2 inputs. Ensure correct polarity.
- Připojení baterie: Connect the battery bank to the dedicated battery terminals. Observe correct polarity (+/-).
- Připojení k síti: Connect the inverter to the main electrical grid.
- Backup Load Connection: For critical loads, connect them to the backup output.
- Smart Meter Connection: Connect the three-phase Smart Meter as per the wiring diagram provided in the full installation guide.
- Základy: Ensure the inverter chassis is properly grounded.
4. Communication Setup (Wi-Fi)
The inverter features integrated Wi-Fi for monitoring and configuration. Follow these general steps:
- Zapněte střídač.
- Connect your device (smartphone, laptop) to the inverter's Wi-Fi hotspot (SSID typically starts with "GoodWe_").
- Access the inverter's web interface via a browser (default IP address usually 192.168.1.1).
- Configure network settings to connect the inverter to your home Wi-Fi network.
- Register the inverter on the GoodWe monitoring platform (e.g., SEMS Portal) for remote monitoring.
Obsluha střídače
1. Počáteční zapnutí
After all connections are secure and verified:
- Turn on the DC isolator switch for the PV array.
- Zapněte jistič baterie.
- Turn on the AC breaker from the grid.
- The inverter will perform a self-test and then begin operation. Observe the LED indicators on the front panel for status.
2. Monitorování
Monitor the inverter's performance via the integrated web server or the GoodWe monitoring app/platform. Key parameters to observe include:
- PV power generation
- Battery charge/discharge status
- Grid interaction (export/import)
- Spotřeba zátěže
- System status and error codes
3. Postup vypnutí
To safely shut down the inverter:
- Turn off the AC breaker from the grid.
- Vypněte jistič baterie.
- Turn off the DC isolator switch for the PV array.
- Wait for all indicators on the inverter to turn off.
Údržba
Pravidelná údržba zajišťuje optimální výkon a dlouhou životnost vašeho měniče.
- Měsíční: Visually inspect the inverter and wiring for any signs of damage, corrosion, or loose connections. Ensure ventilation openings are clear of dust and debris.
- Každoročně: Have a qualified technician perform a thorough inspection, including checking electrical connections, torque settings, and system performance. Clean the inverter's heat sink if necessary.
- Keep the area around the inverter clean and free from obstructions.
Odstraňování problémů
This section provides basic troubleshooting steps for common issues. For complex problems, contact GoodWe technical support or a certified installer.
| Problém | Možná příčina | Řešení |
|---|---|---|
| Měnič se nezapíná | No DC input from PV or battery; AC grid disconnected; Emergency stop activated. | Check all breakers and isolators (PV, battery, AC grid). Ensure emergency stop button is disengaged. |
| Nízký výstupní výkon | Shading on PV panels; Dirty PV panels; Inverter derating due to high temperature. | Check for shading. Clean PV panels. Ensure adequate ventilation around the inverter. |
| Chyba komunikace | Wi-Fi signal weak; Incorrect network settings; Router issue. | Check Wi-Fi signal strength. Reconfigure network settings. Restart router. |
| Zobrazí se kód chyby | Internal fault; Grid fault; PV overvoltage/podvoltage. | Note the error code and consult the full user manual or contact GoodWe support. Do not attempt repairs yourself. |
Záruka a podpora
GoodWe products typically come with a standard warranty. Please refer to your purchase documentation or the official GoodWe webkonkrétní záruční podmínky platné pro váš region a model naleznete na webových stránkách.
For technical support, warranty claims, or further assistance, please contact your installer or the official GoodWe support channels:
- GoodWe Official Webmísto: www.goodwe.com
- SEMS Portal (Monitoring): www.semsportal.com
- Refer to the contact information provided with your product or on the GoodWe webweb s regionálními telefonními čísly podpory.