LEMB 91 AZ, AAE 0A 0 JW, D-00-52213-01

Sterling Sihi Gmbh Lemb 91 Az, Aae 0A 0 Jw, D-00-52213-01 Pump Instruction Manual

Model: LEMB 91 AZ, AAE 0A 0 JW, D-00-52213-01

1. Úvod

This manual provides essential information for the safe and efficient installation, operation, and maintenance of the Sterling Sihi Gmbh Lemb 91 Az, Aae 0A 0 Jw, D-00-52213-01 Pump. Please read this manual thoroughly before attempting to install or operate the pump. Retain this manual for future reference.

2. Bezpečnostní informace

VAROVÁNÍ: Nedodržení těchto bezpečnostních pokynů může vést k vážnému zranění, smrti nebo poškození majetku.

3. Konec produktuview

The Sterling Sihi Gmbh Lemb 91 Az, Aae 0A 0 Jw, D-00-52213-01 is a robust industrial pump designed for various applications. This section provides a general overview of the pump's components and identification.

Sterling Sihi Gmbh Lemb 91 Az Pump

Obrázek 1: Obecné informace view of the Sterling Sihi Gmbh Lemb 91 Az pump. This image shows the overall structure of the pump, including the motor housing, cooling fins, and inlet/outlet ports.

Sterling Sihi Gmbh Lemb 91 Az Pump Nameplate

Figure 2: Close-up of the pump's nameplate. This label provides critical information such as the model number (LEMB 91 AZ, AAE 0A 0 JW, D-00-52213-01), manufacturer (Sterling Sihi GmbH), and various operational specifications.

4. Nastavení a instalace

Správná instalace je zásadní pro výkon a životnost čerpadla. Dodržujte tyto obecné pokyny:

  1. Montáž: Securely mount the pump on a stable, level surface capable of supporting its weight (approximately 68.4 pounds). Use appropriate fasteners to prevent vibration and movement.
  2. Připojení potrubí: Connect the inlet and outlet piping. Ensure all connections are leak-free and that the piping is adequately supported to avoid strain on the pump. Use flexible connectors if necessary to absorb vibration.
  3. Elektrické připojení: Have a qualified electrician connect the pump to the power supply. Verify that the voltage and frequency match the pump's requirements as specified on the nameplate. Ensure proper grounding.
  4. Priming (if applicable): For self-priming pumps, ensure the casing is filled with liquid before initial startup. For non-self-priming pumps, ensure the suction line and pump casing are completely filled with liquid and free of air.
  5. Počáteční kontrola: Before starting, check all connections, ensure no tools or debris are near moving parts, and confirm all safety guards are in place.

5. Návod k obsluze

Follow these steps for safe and effective operation of your pump:

  1. Kontrola před spuštěním: Verify that the pump is properly primed (if required) and that all valves in the suction and discharge lines are open.
  2. Spuštění: Energize the pump's power supply. The pump should start smoothly. Listen for any unusual noises or vibrations.
  3. Sledování: During operation, regularly monitor the pump's pressure gauges, flow rates, and temperature. Ensure it operates within its specified parameters.
  4. Vypnout: To stop the pump, de-energize the power supply. Close any necessary valves in the discharge or suction lines as per system requirements.
  5. Nouzové zastavení: In case of an emergency, immediately cut power to the pump using the designated emergency stop mechanism.

6. Údržba

Regular maintenance ensures optimal performance and extends the lifespan of your pump. Always disconnect power before performing maintenance.

7. Řešení problémů

This section provides solutions to common pump issues. For complex problems, consult a qualified technician.

ProblémMožná příčinaŘešení
Čerpadlo se nespustíNo power; Motor overload; Seized impellerCheck power supply and circuit breaker; Reset overload; Inspect and free impeller
Nízký průtok nebo tlakAir in system; Clogged impeller/piping; Worn impeller/sealsPrime pump/bleed air; Clean impeller/piping; Inspect and replace worn parts
Nadměrný hluk/vibraceCavitation; Misalignment; Worn bearings; Loose mountingCheck suction conditions; Align pump/motor; Replace bearings; Tighten mounting bolts
Čerpadlo netěsníWorn mechanical seal/packing; Loose connectionsReplace seal/packing; Tighten connections

8. Specifikace

The following specifications are provided for the Sterling Sihi Gmbh Lemb 91 Az, Aae 0A 0 Jw, D-00-52213-01 Pump:

9. Záruka a podpora

For warranty information and technical support regarding your Sterling Sihi Gmbh Lemb 91 Az, Aae 0A 0 Jw, D-00-52213-01 Pump, please refer to the documentation provided at the time of purchase or contact the seller directly. As this item is listed as used, specific warranty terms may vary.

Související dokumenty - LEMB 91 AZ, AAE 0A 0 JW, D-00-52213-01

Předview Instructions de fonctionnement du programmateur SEAeasy (SEP)
Manuel d'utilisation détaillé pour le programmateur SEAeasy (SEP) de SEA Systèmes de fermetures, couvrant la configuration, les fonctions, les menus, les paramètres et les accessoires.
Předview Návod k obsluze, montáži a údržbě modulárního sudu a kónického fermentoru Blichmann Engineering Cornical
Komplexní návod k obsluze, montáži a údržbě modulárního sudu a kónického fermentoru Blichmann Engineering Cornical™. Seznamte se s jeho funkcemi, součástmi, čištěním, dezinfekcí a přestavbou pro vaření piva.
Předview Blichmann Engineering Hybrid™ マニホールド組立マニュアル
Blichmann Engineering Hybrid™マニホールドの組立手順、部品リスト、および安全に関する重要な情報な情報な情報提供する公式マニュアルです。ホームブルーワー向けに設計されてま
Předview Návod k montáži a údržbě skříňky na boty Nicetree
Komplexní návod k montáži, parametry produktu, pokyny k péči a informace o záruce pro skříňku na boty Nicetree. Naučte se, jak skříňku bezpečně sestavit a udržovat ji v dobrém stavu.
Předview ChargePoint LCEM: Local Charging Energy Manager Datasheet
Detailed specifications, features, and ordering information for the ChargePoint LCEM, a local charging energy management system for electric vehicle charging infrastructure.
Předview Seznam dílů sekačky na trávu Black & Decker CM600 typ 1
Podrobný seznam dílů a schéma zapojení sekačky na trávu Black & Decker CM600 typ 1, včetně čísel dílů a jejich množství. Informace aktuální k roku 2005.